Environmental Transaction Services
Delta-Simons’ provided environmental due diligence and flood risk assessment support to Realstar Group as part of their investment in the long leasehold of two private rented sector (PRS) residential buildings within the first phase of the East Wick and Sweetwater development in the Queen Elizabeth Olympic Park.
Environmental Due Diligence
Environmental Transaction Support
In 2020 Tristian Capital Partners and Cording Real Estate acquired Holborn Links Estate in the Bloomsbury area of Holborn, central London as part of their recent major investment push in the UK.
Material & Waste Management
Air Quality
Water Services
ESG
The Client wished to undertake Environment, Social & Governance (ESG) appraisals for a multi-site portfolio including energy efficiency and health & safety improvements.
Environmental Planning
Environmental Impact Assessment (EIA)
Noise Ecology Air Quality
Water Services
Geo-environmental
The Client wished to submit two planning applications, one hybrid application for the development of 330 houses and a supermarket, with a separate application for 29 houses. The client wanted to keep costs down by using similar baseline for both sites.
Contaminated Land
Material & Waste Management
The Delta-Simons team were appointed as the contaminated land consultants for the project. Delta-Simons commenced work on the site in April 2007 and continued until 2012.
Contaminated Land
Drilling
Geotechnical
Ground Gas & Vapour
Water Quality Testing
Delta-Simons was appointed as the Geo-Environmental Specialist to review existing ground investigation data, produce a Preliminary Risk Assessment, Geo-Environmental Assessment, Remediation Strategy and Ground Conditions Chapter for an Environmental Statement to support the planning application for the site.
Contaminated Land
Delta-Simons was instructed by the Client to determine and assess the baseline soil and groundwater conditions at their Site, in order to support a new application for a Part A(2) Environmental Permit.
Contaminated Land
Material & Waste Management
This desirable brownfield site in rural Cheshire presented complex ground risks as it is situated on a large peat deposit.
Environmental Planning
Water Services
The Client was required to submit a planning application for the cold repair of the existing glass furnace on their Site. This involved shutting down the continuously operating glass production line, whilst all furnace components were either replaced, renewed, or upgraded. The repair required on-Site temporary changes to cater for additional deliveries and storage areas, which would allow the Client to continue with other operations on the Site, whilst glass production ceased.